 |
 |
 |
 |
 |
 |
 |
 |
 |
In
the early nineties we were fortunate to have been involved in
the construction of several aviation hangar facilities for Tramco,
(now BF Goodrich) at Paine Field in Everett. The knowledge and
experience gained on those projects has allowed us the opportunity
to be involved in the construction of several aviation related
projects since, making our total aviation construction and renovation
experience over 1,200,000 square feet. |
 |
|
|
 |
 |
| Goodrich AeroStructures Integration Services Facility |
 |
 |
| Goodrich AeroStructures |
 |
 |
| AHBL Civil and Structural Engineers |
|
 |
 |
 |
 |
| Design-build assembly facility project for Goodrich AeroStructures to deliver product for Boeing’s 787 Dreamliner project. Included 140,000 sf of concrete tilt-up construction with metal decking on metal joists with a single-ply roofing system. Also includes a 6,000 square foot office node and a similar sized mechanical/electrical room node along with a completely enclosed loading dock which accommodates a 15-ton bridge crane. The main warehouse is built on a 25’ X 100’ spacing, - resulting in 6’-0” deep joists to span the length. Many specialty features as well. |
|
|
 |
 |
 |
 |
| BF Goodrich Component Management Build-out |
Everett, WA |
| Emery/Aeroground Building |
SeaTac, WA |
| Federal Express Sort Facility Expansion |
SeaTac, WA |
| Goodrich AeroStructures Integration Services Facility |
Everett, WA |
| Kilo 6 Hangars, Paine Field |
Everett, WA |
| Menasco Assembly Building |
Everett, WA |
|
| Southwest Airlines Addition |
SeaTac, WA |
| Tramco Hangar I Building |
Everett, WA |
| Tramco Hangar II Renovation and Improvements |
Everett, WA |
| Tramco Hangar III |
Everett, WA |
| Tramco Hangar III Water Tank |
Everett, WA |
|
|
|